The purpose of this program is to define the operations in the structure.
The operation list is displayed in operation number order.
Options
Text | Select this option to view/work with text. |
Cost prices | Select this option to maintain operation hours prices. |
Conf criteria | Select this option to define conformity criteria to be connected to the project structure operation. During creation of manufacturing orders, included criteria will be copied to the manufacturing order operation and be printed on the operation cards as informational text. |
Note: These options are only displayed when in change mode.
Function keys
Add | Add a new operation information. |
This level material | Maintain material on this level. |
Minutes/Decimals | Toggle between hours and minutes and hours and decimals for the operation times. |
Previous level | Only used if you are maintaining lower level operations. Return to the previous operation level. |
Add detail line | Add an operation with detailed information. |
- Customer
- Project
- Status
- The code indicates the status of the project/quotation.
- Phase
- Line number
- Item
- Level
- The current level number within the structure.
- Op no
- Description
- Work centre
- TB-code
- Run and labour time
- The run and labour time in hours for the operation i.e. the actual time spent on the operation. This time is used as a part in the Project/quotation costing calculation in combination with the operation costs.
- Text
- Indicates if extended operation text exists for the operation. If text exist under an operation this information will be copied under manufacturing order creation.