Work with item lead times, Fast update (BAS026D)

This program is used to update items within a proposal with the same entered lead time value for a specific interval.

Proposal number

Selection

  • Planner
  • Item group
  • Item family
  • Item sector
  • Department section
  • Item type
    Valid intervals are 1-2.
  • Item class
    Valid intervals are 1-4.
  • Warehouse
  • Item
New prod lead time
The new production lead time. The selected items will be updated with the new production lead time.
New lead time
This field is only displayed if Lead time calc is set to 2 or 3 on the Lead time proposal creation panel. The new lead time to be used for sales order availability check. The selected items will be updated with the new lead time.